Hotel Room Furniture
Beds, headboards, nightstands, desks, wardrobes, luggage benches, minibars and selected seating.

8613823494762
Hospitality project dossier / Foshan
Source hotel furniture and hospitality furniture for guest rooms and public areas. Submit your BOQ, drawings and room schedule for specification review, mock-up planning, quality control, packaging and delivery sequencing.

01 / Project scope
Hotel furniture supply can be reviewed as one project package or by selected category. Final production follows approved BOQs, drawings, physical samples and written specifications.
Beds, headboards, nightstands, desks, wardrobes, luggage benches, minibars and selected seating.
Custom hotel and hospitality casegoods developed from drawings, finish schedules, hardware and room quantities.
Sofas, lounge chairs, side tables, coffee tables and coordinated public-area furniture.
Dining chairs, tables, banquettes and related loose furniture reviewed to project specifications.
Coordinated bedroom, living and dining furniture allocated by approved room type.
Custom dimensions, finishes and upholstery developed for commercial use and design intent.

02 / Start with documents
A useful review identifies missing specifications before pricing. This reduces substitutions, finish disputes and delivery misunderstandings later in the project.
03 / Project milestones
The sequence below is a procurement framework. Responsibilities, approvals and timing are confirmed for each project rather than presented as fixed promises.
Review the BOQ, drawings, room types, quantities, destination and schedule.
Identify missing dimensions, materials, finishes, hardware and standards.
Record assumptions, exclusions, commercial terms and approval requirements.
Coordinate product details and interfaces where drawing support is agreed.
Approve appearance, dimensions, function, materials and finish references.
Schedule manufacturing against approved documents and project milestones.
Check agreed dimensions, appearance, function, finish and packaging.
Coordinate labels, packing lists, shipment sequence and agreed documents.
04 / Specification control
Inspection criteria should point back to approved documents and physical references, not subjective expectations.
Room types, quantities, furniture codes and allocation by area.
Substrates, solid wood, engineered panels, metal, stone and upholstery.
Veneer, stain, paint, gloss level, metal finish and approved samples.
Hinges, runners, locks, power/data provisions and functional requirements.
Buyer-supplied fire, environmental, testing and labeling requirements.
Protection, labels, packing lists, shipment sequence and site responsibilities.
05 / Visual references
These are product and material directions from the current website, not named hotel client projects.


Final dimensions, materials, finishes and performance requirements remain subject to approved project specifications.
06 / Procurement resources
These guides separate two lower-volume but high-intent procurement topics from the main supplier page.
Plan materials, finishes, hardware, mock-ups and inspection criteria for hard-surface guest-room furniture.
Read the casegoods guideOrganize furniture by room type, BOQ, package scope, labels, shipment phases and project responsibilities.
Plan furniture packages07 / Buyer questions
Short answers to common procurement questions help buyers send a more complete brief.
Yes. A useful review also needs drawings or references, materials, finishes, quantities, destination, standards and schedule.
Mock-up requirements can be reviewed after the scope is clear. Cost, responsibilities, criteria and timing must be confirmed.
Use approved physical samples, finish boards, written specifications, batch references and inspection records.
Room, floor or area labeling can be reviewed against the delivery sequence, packing list and receiving plan.
Compare suppliers with the same BOQ, drawings, finishes, mock-up requirements, inspection scope, exclusions and delivery assumptions.
MOQ depends on the furniture mix, materials and custom scope. It is confirmed after BOQ and specification review.
Email BOQ and drawing files to suiying@lenatees.com or send project details through WhatsApp.
Send your company, project location, BOQ, drawings, room count, materials, destination and target milestones.
Project RFQ tip: include your company, country, project location, room count, BOQ/drawing status, materials, destination and target milestones.
Contant us