صُنع وفقًا للمواصفات. تم فحصه قبل الشحن.
Use these checkpoints to plan the inspection of custom, wholesale and project furniture. Agree the scope, acceptance criteria and records with Lenatees and your appointed inspector before production, using the approved specification, sample and packing requirements.

Photos supplied from the Lenatees production archive and labelled illustrations explain the checkpoints. They are not signed inspection reports, product test results or proof of a particular customer’s delivery. Agree who checks each item and how approval is recorded for your order.
ست مراحل للتفتيش على طلبات الأثاث

المواد الواردة
تأكد من أن المواد المرئية والمكونات الرئيسية تتوافق مع مواصفات الطلب قبل دخولها مرحلة الإنتاج.
- نوع التنجيد ومرجع الألوان
- اختيار الأخشاب والمعادن والمعدات
- مواصفات الرغوة والحشو
- حالة المواد عند وصولها

الهيكل والتصميم
مراجعة الأبعاد والمحاذاة والوصلات وتفاصيل التجميع مقارنةً بالرسم المعتمد أو العينة المرجعية.
- الأبعاد والنسب الرئيسية
- محاذاة الإطار وأمن الوصلات
- موضع القطع المعدنية ووظيفتها
- ثبات المنتج قبل التنجيد

الرغوة، الحشو والراحة
تحقق من الرغوة وطبقات الحشو المختارة، والشكل، ومستوى الراحة مقارنةً بالعينة المعتمدة قبل إغلاق غطاء التنجيد.
- نوع الرغوة وترتيب الطبقات
- شكل المقعد والظهر
- محاذاة الحواف والتحضير الدقيق
- مقارنة الراحة مع العينة المعتمدة

التنجيد والتشطيبات
افحص جودة الصنع الظاهرة، بما في ذلك الدرزات، وشد القماش، والتشطيبات السطحية.
- الخياطة ومحاذاة الدرزات
- اتجاه النسيج والتوتر السطحي
- اتساق لون الطلاء النهائي
- الخدوش أو العلامات أو الأوساخ الظاهرة

مراجعة المنتج النهائي
قارن المنتج النهائي بمعلومات الطلب قبل الموافقة على التعبئة.
- الطراز والكمية والتكوين
- المظهر العام والوظيفة
- جميع الملحقات والمكونات المذكورة موجودة
- الملصقات أو العلامات الخاصة بالمشتري

فحص التعبئة والتحميل
تأكد من أن إجراءات الحماية والتعريف تتوافق مع مسار الشحن ومتطلبات الطلب.
- المواد الواقية وحالة الكرتون
- الملصقات، تشكيلة المنتجات وقائمة التعبئة
- تسلسل التحميل وتخطيط المساحات
- تقديم سجل الصور عند الطلب
Agree how issues will be handled
| مستوى المشكلة | المعنى المعتاد | مثال | الإجراء التالي |
|---|---|---|---|
| حرج | تتعلق المشكلة بالسلامة أو الأداء الوظيفي أو مدى مطابقة المنتج للطلب. | طراز خاطئ، أو تصميم غير آمن، أو جزء أساسي مفقود. | أوقف الإفراج عن المنتج، وصحّح العيب، ثم أعد الفحص. |
| جسيم | يتأثر الاستخدام أو المظهر أو المواصفات تأثراً جوهرياً. | تباين واضح في التشطيب، أو تجميع غير مستقر، أو عيب ظاهر في خط التماس. | إصلاح القطعة أو استبدالها قبل اعتماد شحنها. |
| طفيف | اختلاف بسيط في المظهر لا يؤثر على الاستخدام العادي. | اختلافات تجميلية طفيفة ضمن معايير القبول المتفق عليها. | قم بتسجيل المشكلة وحلها وفقًا لمتطلبات الطلب. |
Inspection planning by furniture category
| نقطة المراجعة | الأرائك وأماكن الاسترخاء | الأسرة | أثاث غرفة الطعام |
|---|---|---|---|
| الهيكل والاستقرار | ✓ | ✓ | ✓ |
| طبقات الراحة | ✓ | ✓ | حسب الاقتضاء |
| التنجيد والدرزات | ✓ | ✓ | حسب الاقتضاء |
| التشطيب واللون | ✓ | ✓ | ✓ |
| وظيفة القطع المعدنية | حسب الاقتضاء | حسب الاقتضاء | حسب الاقتضاء |
| التغليف والملصقات | ✓ | ✓ | ✓ |
Sofa sample approval checklist before production
For an OEM sofa order, record what you have approved against an identified model, sample and document revision before authorizing production. A message saying “looks good” does not explain whether you accepted the dimensions, upholstery, comfort or packing. Use a written approval record alongside the inspection stages on this page, and agree which unresolved items prevent production from starting.
Identify the reference before checking the sample
Start your furniture quality control checklist with the model or SKU, sample ID and revision, drawing revision, upholstery or finish references, reviewer and review date. For a sectional sofa, identify the configuration and orientation as well. If a drawing, swatch or sample changes, record the new reference rather than leaving two versions that could be mistaken for the approved one.
Agree the requirement for each item before recording the result. “Matches drawing revision B” is more useful than “size OK.” Use the dimensions and tolerances agreed for the selected model; this worksheet does not set universal acceptance limits.
Separate the observation from the decision
Give each check its own requirement or reference, observation and decision. Include relevant dimensions, upholstery appearance, seam position, comfort, assembly details and packing or label artwork within the agreed scope. Where a decision depends on physical feel or comfort, agree how the physical sample will be reviewed. Photos and video can support a discussion, but do not treat visual approval as confirmation of comfort or material composition.
Swipe across the table to review every column.
| Decision | What to record | Production action |
|---|---|---|
| Approve | The exact item and reference accepted, with reviewer and date. | Confirm separately whether all required approvals are complete and production is authorized. |
| Revise | The change required, who responds, and what needs another review. | Keep the affected model on hold until the required revision is approved. |
| Hold | The missing evidence or unresolved requirement, with an action owner. | Do not release the affected model until the hold is resolved and authorization is recorded. |
Hypothetical example: A buyer accepts the upholstery swatch for a two-seat sofa but asks for a different leg finish. Record the upholstery approval separately, mark the leg finish “revise,” identify the replacement finish reference and keep production on hold pending the required review. An accepted fabric does not mean the complete sofa is approved.
Carry the agreed reference into inspection planning
Download the blank sample approval checklist (CSV) to record these decisions. Use it to prepare the approval record for your order. Keep changes and follow-up visible until they are resolved, then agree which references will guide production checks and final inspection.
Sample approval defines the agreed reference; it does not establish that the bulk shipment conforms. Plan the later inspection scope separately. To discuss an OEM order, send your selected model, quantity, destination, sample references and open changes through our custom sofa manufacturing enquiry page. Ask for written confirmation of the approval responsibilities and production-release conditions for your order.

حدد قائمة المراجعة قبل بدء الإنتاج.
أرسل قائمة المنتجات المطلوبة، والرسومات ومتطلبات العينات ونقاط الفحص الرئيسية. ويمكننا بعد ذلك الاتفاق على نطاق فحص يناسب مشروعك.
هل تنوي الاستعانة بمفتش مستقل؟ اطّلع على خيارات التحقق من المصنع، ثم اتفق على الجدول الزمني وشروط الوصول ومتطلبات التفتيش الخاصة بطلبك.
أسئلة المشتري
ما هي المراحل التي تشملها عملية مراقبة جودة الأثاث؟
يمكن أن تشمل مراقبة الجودة المواد الواردة، وتصنيع الهيكل، والرغوة والحشو، والتنجيد والتشطيب، والأبعاد، ومراجعة المنتج النهائي، والتعبئة، والتحضير للتحميل.
هل يمكن للمشتري تقديم قائمة مراجعة خاصة بالمشروع؟
نعم. يمكن للمشترين تقديم الرسومات، والعينات المعتمدة، والتفاوتات المسموح بها، ومعايير التشطيب، ونقاط الفحص، حتى يتسنى لفريق الإنتاج مراجعتها قبل بدء التصنيع.
كيف يتم فحص تغليف الصادرات قبل الشحن؟
يتم فحص طريقة التعبئة ونقاط الحماية وعلامات الشحن ومتطلبات التحميل مقارنةً بالطلب المعتمد وطريقة النقل قبل الشحن.
