دليل تكاليف وميزانية أثاث الفنادق لمشتري المشاريع
What will it cost to furnish one guestroom? Price the pieces on one approved room drawing first. Then apply that package to the number of rooms that actually use it. A pair of nightstands supplied with the bed in one bid can be a separate purchase in the next.
For a U.S. planning benchmark, the median furniture, fixtures and equipment (FF&E) budget was $18,321 per room for select-service hotels in the HVS U.S. Hotel Development Cost Survey 2026, Exhibit 6. HVS compiled project budgets from 2025. Its FF&E category covers a wider purchasing scope than a guestroom furniture package. Use the figure to check the owner’s overall allowance. Use the drawings and written quotes to price the pieces your supplier will deliver.
قم بوضع الميزانية بناءً على أنواع الغرف ورموز الأثاث
ابدأ بجدول الغرف. قم بإدراج كل فئة من فئات الغرف، وعدد الغرف في تلك الفئة، ومجموعة الأثاث المستخدمة فيها. قد تتطلب غرفة «كينغ» قياسية لوح رأس سرير مختلفًا، أو عددًا مختلفًا من الطاولات الجانبية، أو مقعدًا مختلفًا لوضع الحقائب مقارنةً بغرفة «توين»؛ وقد تشتمل الأجنحة على مقاعد غرفة المعيشة، وأثاث غرفة الطعام، والمزيد من قطع الأثاث الخزانية.
استخدم صفحة باقات أثاث غرف الفنادق لتنظيم قطع الأثاث المعتادة في غرف الضيوف، وراجع فئات أثاث غرف النوم when defining individual pieces. Then convert the list into a bill of quantities (BOQ) with one furniture code per item and one controlled quantity per room type. This creates a traceable budget instead of a rough room-rate assumption.
| قسم الميزانية | المدخلات النموذجية | مصدر التباين المشترك |
|---|---|---|
| أثاث غرف الضيوف من فئة القطع الصلبة (Casegoods) | لوح رأس السرير، وطاولات بجانب السرير، ومكتب، وخزانة ملابس، ووحدة ميني بار، ولوحة التلفزيون، ومقعد لتخزين الحقائب. | تركيب الألواح، والقشرة الخشبية أو الرقائق الخشبية، والتفاصيل الحجرية/المعدنية، والتجهيزات، والخدمات المدمجة. |
| الأثاث غير الثابت | كرسي مكتب، كرسي استرخاء، أريكة، مسند للقدمين، وطاولات جانبية. | الهيكل، والرغوة، وكمية مواد التنجيد، وخصائص القماش، وأبعاد المقاعد. |
| المناطق العامة | أثاث الردهة والمطعم والبار وقاعات الاجتماعات والأماكن الخارجية. | تصاميم فريدة من نوعها، وأحجام كبيرة، وتشطيبات معقدة، وواجهات مصممة خصيصًا للموقع. |
| خدمات المشاريع | الرسومات التنفيذية، وعينات التشطيبات، والنماذج الأولية، وعمليات الفحص، والتعبئة، وملصقات الغرف. | عدد جولات الموافقة، ومدى تعقيد النماذج الأولية، ومتطلبات التسليم على مراحل. |
| اللوجستيات | التعامل مع البضائع من المنشأ، والشحن، والتأمين، والتخليص الجمركي، والتسليم في الوجهة، والتركيب. | حجم الشحنة، ومسار الشحن، والرسوم الجمركية، والرسوم المحلية، وشروط التسليم المتفق عليها. |
احسب ميزانية الأثاث لكل غرفة انطلاقاً من جدول الكميات
استخدم أسعار الوحدات الواردة في عرض الأسعار والكميات المحدّدة في نسخة واحدة معتمدة من جدول الكميات (BOQ). احسب تكلفة كل نوع من الغرف على حدة قبل جمع النتائج؛ فلا ينبغي اعتبار الجناح والغرفة العادية حزمتين متماثلتين.
| بند الميزانية | طريقة الحساب | البيانات التي تُدخلها |
|---|---|---|
| حزمة نوع واحد من الغرف | اجمع حاصل ضرب كمية كل صنف في الغرفة في سعر وحدته الوارد في عرض الأسعار. | أدخل المجموع الفرعي للحزمة والعملة. |
| جميع أثاث غرف الضيوف | اضرب المجموع الفرعي لحزمة كل نوع من الغرف في عدد الغرف من ذلك النوع، ثم اجمع النتائج. | أدخل أعداد الغرف والمجموع الفرعي لأثاث غرف الضيوف. |
| متوسط تكلفة الأثاث المرجّح لكل غرفة | اقسم المجموع الفرعي لأثاث غرف الضيوف على إجمالي عدد غرف الضيوف. | سجّل المبلغ لكل غرفة والعملة ونسخة جدول الكميات. |
افصل أثاث المساحات العامة وتكاليف المشروع عن حساب أثاث غرف الضيوف. وبالنسبة إلى العيّنات والفحص والتعبئة والشحن ورسوم الاستيراد والمناولة في الموقع والتركيب، سجّل ما إذا كانت تكلفة كل منها مشمولة أو مستثناة أو مرصودة في ميزانية منفصلة، وحدّد الطرف المسؤول عنها. لا تضف أي تكلفة مرة أخرى إذا كانت مدرجة بالفعل في سعر الوحدة الوارد في عرض الأسعار.
لا تقدّم ورقة العمل هذه تقديراً للأسعار. يقتصر حساب التكلفة لكل غرفة أعلاه على أثاث غرف الضيوف؛ ويجب إظهار أي توزيع لتكاليف أثاث المساحات العامة أو تكاليف المشروع على نحو منفصل. عند مقارنة المورّدين، اذكر تاريخ عرض الأسعار وشرط التسليم والاستثناءات.
تنزيل ملف ميزانية أثاث الفنادق (Excel، باللغة الإنجليزية)
استخدم الملف القابل للتعديل لمقارنة تكاليف مجموعات الأثاث بحسب نوع الغرفة، وتتبع تكاليف المشروع التي تُقدَّم لها عروض أسعار منفصلة. أدخل عروض الأسعار التي حصلت عليها من مورّديك؛ لا يتضمن الملف أسعارًا محددة مسبقًا، ولا يُعدّ عرض سعر من Lenatees.
Who buys the decorative pillows and throws?
Ask the designer for the approved count per bed, and ask housekeeping how many spares it wants for opening day. A decorative pillow quote can cover just the cover, or the cover and insert together. Get both bidders to price the same size, fabric and contents. Price the throw on its own line.
For example, a 40-room hotel with one bed per room, two decorative pillows and one throw per bed needs 80 pillows and 40 throws on the beds. If housekeeping requests eight spare pillows and four spare throws, the order becomes 88 pillows and 44 throws. These are example quantities. Multiply each order quantity by its written unit quote to get the opening allowance.
If the owner buys these items separately, enter the allowance once on the workbook’s Budget sheet under Other project cost. Choose Add separately and record the buyer and quote reference. If a room package already covers the full order, choose Included elsewhere, cite the package line and leave the amount blank. When it covers only the pieces on the beds, add just the spares separately.
Compare the same bedside package in both bids
In Lenatees’ 2024 luxury bed quotation, the BL002 and BL011 rows expressly excluded the nightstands. That dated quotation illustrates why a room photograph alone cannot establish the scope. For a drawing that calls for one bed and two nightstands, compare the bed-only quote plus two separately priced nightstands with a written price for the complete set. Check that both prices use the same finish and delivery terms before multiplying by the room count.
تحديد العوامل المؤثرة في التكلفة قبل طلب عروض الأسعار
تصبح مقارنات الموردين أكثر فائدة عندما يسلط فريق المشروع الضوء على القرارات التي تُحدث تغييرًا جوهريًّا في عملية البناء. بالنسبة للأثاث الصلب، تشمل هذه العوامل الركيزة، ومواد الواجهة، ومعالجة الحواف، ومواد السطح، والتركيبات المعدنية، وواجهات الإضاءة أو الطاقة، ونظام التشطيب المطلوب. أما بالنسبة للأثاث المنجد، فتشمل المتغيرات الرئيسية هيكل الإطار، وتركيب الرغوة، ومواصفات النسيج، وتكرار النقوش، وأي اختبارات مطلوبة.
- يرجى تحديد ما إذا كانت الأبعاد نهائية، أم أنها قيم تتعلق بمرحلة تطوير التصميم، أم أنها مقترحات من الموردين.
- افصل المواد التي يوفرها العميل عن المواد التي يوفرها المورد.
- حدّد ما يشمله العرض من عينات أو نماذج أولية أو أصناف الغرفة النموذجية.
- أدرج التعبئة، وعلامات الكراتين، وملصقات الطوابق والغرف بوصفها بنوداً مسعّرة ضمن المخرجات المطلوبة.
- اطلب من كل مقدم عرض أن يدرج الاستثناءات والافتراضات بجانب البند ذي الصلة في قائمة كميات العمل.
افصل سعر المصنع عن تكلفة وصول الأثاث والخدمات المتفق عليها في الوجهة
يُعد عرض الأسعار الصادر عن المصنع جزءاً من ميزانية المشروع. وقبل الموافقة على الطلب، حدّد الجهة المسؤولة عن التعبئة للتصدير، والشحن، والتأمين، والإجراءات الجمركية، والرسوم الجمركية أو أي رسوم أخرى، والمناولة في الوجهة، والتخزين، والتركيب، واستبدال الأصناف المتضررة أثناء النقل. وبالنسبة إلى المشاريع في الولايات المتحدة، يظل المستورد مسؤولاً عن فهم متطلبات الاستيراد السارية، حتى عند الاستعانة بمخلّص جمركي.
تشرح خدمة شراء الأثاث والتجهيزات والمعدات الفندقية (FF&E) سير العمل الأشمل من جدول الكميات (BOQ) حتى التسليم، بينما توضح قائمة مراجعة مشتريات الأثاث والتجهيزات والمعدات (FF&E) الخطوات الداعمة للمشتري. راجع دراسات حالات مشاريع الفنادق والمنتجعات المكتملة عند التحقق مما إذا كان نطاق التوريد الذي يقترحه أحد الموردين ملائماً لنوع منشأتك.
استخدم سجلًا لتعديلات الميزانية الخاضعة للرقابة
سجّل كل تغيير بحسب رمز قطعة الأثاث وسببه وتاريخه والجهة التي اعتمدته. وهذا مهم بوجه خاص عند بدء هندسة القيمة. فعند استبدال تشطيب، أو تقليص بُعد، أو تغيير ملحقات الأثاث، يجب تحديث الرسم ومرجع العينة وجدول الكميات (BOQ) والسعر معاً. وإلا فقد لا تتطابق الوفورات المعتمدة مع المنتج الذي يصل إلى الموقع.
أدلة خاصة بالمشروع والإنتاج من المصدر المباشر
توفر مجموعة المنتجات والصور التوضيحية للمشاريع سياقًا للمتغيرات المتعلقة بالتصميم والمواد والكميات واللوجستيات التي تمت مناقشتها في دليل الميزانية هذا.



مراجعة الميزانية
هل تحتاج إلى عرض أسعار مخصص وفقًا لنطاق خدمات فندقك الفعلي؟
أرسل موقع المشروع وجدول أنواع الغرف وأعدادها وجدول الكميات (BOQ) والرسومات واتجاه التشطيبات والموعد المستهدف للتسليم. ويمكن لفريق Lenatees المتخصص في تصنيع أثاث الفنادق مراجعة هذه الملفات وتقديم عرض سعر مبني على نطاق العمل.
المصادر والقيود
- Lenatees Furniture, 2024 luxury bed quotation, rows for BL002 and BL011. The written exclusions illustrate how to read a historical offer. Confirm the scope of a current order with the supplier.
- هيئة الجمارك وحماية الحدود الأمريكية، إرشادات بشأن مسؤوليات المخلّص الجمركي والمستورد.
- يُعد هذا الدليل إطارًا تخطيطيًّا، وليس عرض أسعار. وتعتمد التكاليف الفعلية للمنتج والشحن والضرائب والرسوم الجمركية والتركيب على المواصفات المعتمدة للمشروع وشروط العقد والوجهة والتوقيت.